University of Northern Colorado HTHW Distribution System

Greeley, Colorado • Completed June 1999

UNCHigher Education

Project Overview

Major HTHW piping installation in campus tunnel system coordinated with $20 million renovation project. Project required approximately 8,000 LF of 10" piping with multi-phase construction to maintain building services.

Project Coordination & Planning

This major HTHW piping installation required careful coordination with a $20 million central campus renovation project. Design began in August 1997 and was completed in May 1998, with special emphasis on coordinating spatial relationships and routing of piping in the existing tunnel system.

A project cost estimate was prepared in August 1996 for installing HTHW piping in the tunnel and abandoning the existing direct bury system, subsequently submitted to the State of Colorado for funding approval.

HTHW Piping Installation

The project required installation of approximately 8,000 LF of 10" piping for HTHW within the campus tunnel system. Additional services coordinated in the tunnel included:

  • Chilled water distribution
  • Condenser water systems
  • Heating hot water lines
  • Domestic cold and hot water systems
  • Low pressure steam and condensate return piping
  • Fire line protection systems

Construction also included two valve vaults, an expansion loop, and approximately 30 LF of tunnel modifications.

Multi-Phase Construction & System Switchover

The project was strategically split into three phases of construction to maintain HTHW piping to all buildings during construction. A central plant shutdown was coordinated and scheduled into the construction for switchover from the existing distribution system to the new system. A temporary boiler was installed to supply domestic hot water to the student family apartments during the switchover period.

Final Construction Cost: $1,676,498

Project Details

Location
Greeley, Colorado
Completion Date
June 1999
Square Footage
Pending
Services Provided
Mechanical Engineering
Construction Cost
$1,676,498
Project Manager
Scott McLean
Owner
University of Northern Colorado
Contractor
Gracon Corporation