Skip to main content
SEC - Schendt Engineering CorporationContact Us
Community

Mission Training International Conference Center

Palmer Lake, Colorado • Completed December 2001

MTICommunity

Project Overview

28,500 SF extended-stay conference center with 28 guest rooms, dining facilities, recreation areas, and day care. Featured diverse HVAC systems including PTAC units, VAV boxes, and specialized kitchen exhaust systems.

Overview & Facilities

Mission Training International Conference Center

Palmer Lake, Colorado

This project involved design of a new 28,500 S.F. extended stay conference center for Mission Training International. The building was designed to provide full services to the attendees including guest rooms, dining facilities, recreation room, laundry facilities, and day care. This required a mixed occupancy within the building with various types of occupancy separation.

The facility included 28 motel type guest rooms, a conference room, a training room, office space, a commercial kitchen, full service laundry, and a day care for various age groups.

HVAC Systems Design

The HVAC system for the guest rooms consisted of Packaged Terminal Air Conditioning (PTAC) units with fresh air intakes and a bathroom exhaust fan. The exhaust fans were ducted to sidewall vents due to code limitations.

The commons areas, conference rooms, training rooms, daycare, and office areas were served by a roof mounted variable air volume air handling unit with DX cooling. Heating was provided by reheat coils in pinchdown variable air volume boxes for each zone. Gas log fireplaces were installed in the commons areas to provide an aesthetically pleasing environment where guests could gather.

The kitchen was served by a roof mounted indirect fired make-up air unit with an evaporative cooler. Exhaust systems included a kitchen hood and a dishwashing hood with roof mounted exhaust fans.

Plumbing & Fire Safety Systems

The plumbing systems consisted of a bathroom in each guest room, restrooms in commons areas, a commercial kitchen, and laundry facilities. The commons area restrooms and some of the guestrooms were setup to be ADA compliant for handicapped guests. High efficiency condensing type water heaters were utilized for both the kitchen and domestic hot water systems. A grease interceptor was installed outside to serve the kitchen.

The building was fully sprinkled with a wet pipe sprinkler system using quick response sprinkler heads.

Project Details

ArchitectContractorCompletion DateConstruction Cost
Bollar & Associates
Mr. George Cruz
Colorado Springs, Colorado
(719) 520-0057
K. Ehrhardt ConstructionDecember 2001$2,700,000.00

Project Details

Location
Palmer Lake, Colorado
Completion Date
December 2001
Square Footage
28,500 sq ft
Services Provided
Mechanical Engineering, Plumbing Engineering
Construction Cost
$2,700,000
Project Manager
George Cruz
Owner
Mission Training International
Contractor
K. Ehrhardt Construction

Related Projects

No related projects are linked yet.