No related projects are linked yet.
Limon CF Hail Damage Rooftop Units Replacement
Limon, Colorado
Project Overview
Replacement of hail-damaged rooftop mechanical equipment including approximately 132 fans with direct drive EC motors, 16 rain caps, condensing units, and roof ventilators.
Project Overview
SEC provided engineering design for the replacement of hail-damaged rooftop mechanical equipment at Limon Correctional Facility. The project specifies approximately 132 fans, 16 rain caps, pipe insulation, condensing units, roof ventilators, and control devices. The opinion of probable cost is $1,444,000.
Equipment Design
New fans were designed with direct drive EC motors to reduce energy consumption and maintenance requirements compared to the damaged belt-driven units. SEC measured all existing roof curbs to avoid the need for curb adapters, ensuring clean installations. Coordination was maintained with the Project Manager, Risk Management, and Unified Building Systems throughout design.
Electrical Design
SEC provided complete electrical drawings and schedules with a design intent to utilize the same motor sizes and reuse existing branch feeders wherever possible, minimizing electrical infrastructure modifications and reducing overall project cost.
Project Details
- Location
- Limon, Colorado
- Completion Date
- Pending
- Square Footage
- Pending
- Services Provided
- Mechanical Engineering, Electrical Engineering
- Construction Cost
- $1,444,000
- Project Manager
- Andrew Harris
- Owner
- Limon Correctional Facility