Dillon Community Church
Dillon, Colorado • Completed July 2002
Project Overview
12,600 SF church addition featuring worship area with 500-seat capacity and comprehensive educational facilities. Project included innovative heating systems with CO2-based ventilation optimization and high-efficiency boilers.
Church Addition Space Planning
This project involved design of a 12,600 S.F. addition to an existing church for the community of Dillon. This addition consisted of a worship area with seating for 500 people, narthex, four classrooms, student lounge, office space, kitchenette, and restrooms.
Worship Area Climate Control
The worship area was served by a heating-only, indirect-fired make-up air unit with modulating gas burner. Microprocessor-based controls were utilized to modulate the firing rate based on supply air and space temperature, and modulate the outside air volume based on space CO2 level to minimize energy costs while maintaining comfort for 500 occupants.
Multi-Zone Heating and Ventilation
The narthex, classrooms, student lounge, and kitchen were served by heating-only rooftop units with modulating gas burners and stainless steel heat exchangers due to the large quantity of outside air required. Microprocessor-based controls modulated the firing rate based on space temperature and modulated outside air volume based on space CO2 level to minimize energy costs.
Office Space Conditioning
The office space was served by a heating and cooling rooftop unit with gas heat and DX cooling due to the daily occupancy requirements of this space. This provided year-round climate control for administrative staff working in the facilities.
Restroom Design and Sprinkler System
The restroom groups were ADA compliant and utilized wall-mounted fixtures to make cleaning easier. The building addition was fully sprinkled with a wet pipe sprinkler system using quick response sprinkler heads for fire protection throughout the facility.
Project Details
- Location
- Dillon, Colorado
- Completion Date
- July 2002
- Square Footage
- 12,600 sq ft
- Services Provided
- Mechanical Engineering, Plumbing Engineering
- Construction Cost
- $250,000
- Project Manager
- Chuck Bollar
- Owner
- Dillon Community Church
- Contractor
- Heating Plumbing Engineers, Inc.