Skip to main content
SEC - Schendt Engineering CorporationContact Us
Commercial

Compaq CXO3 Critical Power

Colorado Springs, Colorado

CCCCommercial

Project Overview

Back-up power generation systems for critical computer rooms featuring three 1.1MW diesel generators with integrated cooling and fuel systems. The project included UPS backup systems and comprehensive building automation integration.

Power Generation Systems

This project involved construction of back-up power generation systems to support computer rooms and office space critical to the business needs of Compaq. The generation systems consisted of three (3) 1.1MW diesel engine-driven generators, transfer switches and associated switchgear, and UPS backup systems.

Cooling Systems Design

Schendt Engineering Corporation provided mechanical engineering services to design the cooling systems to support the critical power systems. The cooling systems for the switchgear/UPS room consisted of two (2) 15,000 CFM air handling units with chilled water coils, controlled by a DDC control system and connected to the building automation system.

Fuel Systems and Monitoring

The fuel systems consisted of two (2) 12,000 gallon diesel fuel storage tanks, transfer pumps, and distribution piping. A fuel monitoring system was installed to monitor fuel inventory, provide leak detection, and control fuel transfer operations. The fuel monitoring system was integrated with the building automation system to provide data collection and enhanced monitoring and control capabilities.

Project Details

Location
Colorado Springs, Colorado
Completion Date
Pending
Square Footage
Pending
Services Provided
Mechanical Engineering
Construction Cost
$1,700,000
Project Manager
Vern Plant
Owner
Plant Engineering Consultants
Contractor
Heating & Plumbing Engineers

Related Projects

Compaq Area 9 Buildout

Conversion of a 150,000 SF warehouse space to two-story office space in a fast-track project. Featured innovative mechanical systems with custom VAV units and relocated DirecTv computer room without service interruption.

View Project

Compaq Area 10 SPD Relocation

Three new computer lab facilities with CRAC units and comprehensive mechanical systems supporting testing and design operations. Project integrated front and overhead supply distributions with VAV office systems.

View Project

Compaq Area 4 GEM Buildout

15,000 SF office space with modular air handling system and comprehensive VAV distribution. The project featured innovative mechanical room design and dedicated cooling for communications space.

View Project

Compaq SANS Lab

World-class computer room facility with nine 30-ton CRAC units and comprehensive training infrastructure. Featured specialized cooling systems and integrated building automation for high-performance computing environment.

View Project